< Previous | Contents | Next >
1. Unless expressly specified otherwise, the requirements in the Guidance apply to Floating Production Units for which contracts for construction are signed on or after 7 July 2015.
2. The amendments to the Rules for 2014 edition and their effective date are as follows;
Effective Date 1 July 2015
CHAPTER 1 GENERAL
Section 1 General
- 103. has been amended.
CHAPTER 2 CLASSIFICATION AND SURVEYS
Section 2 Classification
- 204.6 has been amended.
- 204.7 has been newly added.
CHAPTER 8 FIRE PROTECTION, MEANS OF ESCAPE AND FIRE EXTINCTION
Section 1 General
- 101.2 has been amended.
Section 2 Prevention of Fire and Explosion
- 201. has been amended.
Section 3 Suppression of Fire
- 302.6 and 7 have been deleted. (moved to Ch 11, Sec 2.)
CHAPTER 10
ELECTRICAL EQUIPMENT AND CONTROL SYSTEMS
Section 2 Control Systems
- 207. has newly added. (moved from Ch 8, 302.)
- 208. has been amended.
- i -
CHAPTER 11
PRODUCTION AND PROCESS SYSTEMS
Section 2 Design of Process Systems
- 202. has been deleted. (moved to Ch 8, 201.)
CHAPTER 12 IMPORT AND EXPORT SYSTEMS
Section 1 General
- 105.2 has newly added. (moved from Ch 2, 204.6)